Elektrine lite

← Feed

@EdwinG@mstdn.moimeme.ca

2026-09-19 20:55 UTC

@jfmezei@cosocial.ca There’s ways to build a bus terminal in a smart way, instead of keeping what’s there. I don’t have a satellite map of the sector at hand, but let’s say dedicated bus ramps in the M20 axis connecting directly on the bus terminal - over the tracks (or even on the current side of the tracks, with a secondary entrance to the station’s concourse)

Replies (1)

  • @EdwinG@mstdn.moimeme.ca 2026-09-19 21:03

    @jfmezei@cosocial.ca And the M20 there needs to be rebuilt. It was closed as an emergency for a year because the overpass was falling apart. Unless things changed in the past year, it still has its crutches installed.

    Open ##4769071