2026-09-19 21:03 UTC
@jfmezei@cosocial.ca And the M20 there needs to be rebuilt. It was closed as an emergency for a year because the overpass was falling apart.
Unless things changed in the past year, it still has its crutches installed.
Replies (0)
No replies.