Elektrine lite

← Feed

@jfmezei@cosocial.ca

2026-09-19 20:50 UTC

@EdwinG@mstdn.moimeme.ca The project to get rid of the roundabout had been launched by MTQ, but when Turcot became emergency, was abandonned and was zapped from all records. (the access roads from 20 direct to airport were part of project and only things that got done). "that bus" is what remains of our express buses to downtown, so they are quite important, and connect with p,enty of buses at the dorval terminal. Aso buses from Lachine that arrive via Boul Bouchard at the circle.

Replies (1)

  • @EdwinG@mstdn.moimeme.ca 2026-09-19 20:55

    @jfmezei@cosocial.ca There’s ways to build a bus terminal in a smart way, instead of keeping what’s there. I don’t have a satellite map of the sector at hand, but let’s say dedicated bus ramps in the M20 axis connecting directly on the bus terminal - over the tracks (or even on the current side of the tracks, with a secondary entrance to the station’s concourse)

    Open ##4769072