Elektrine lite

← Feed

@Sobtanian@mstdn.games

2026-09-01 21:56 UTC

Right then, for the first time this year I’m gonna join in with #FinishOrFrogAlong, because for the first time I’ve broken my cardinal monogamy rule of one #knitting and one #crochet WIP at a time, because reasons! So here’s what’s in progress and what the plan is, clockwise from the top left: 1\ a german short row heel sock. This was cast on because my wife dared me to and I should’ve known better 😅 Anyway, I finished one sock and said I won’t do the other until everything else is finished! 2\ waffle stitch crochet blanket. This is a mindless, work-on-it-when-I-don’t-want-to-focus kinda thing. Aim is to finish it by next summer. 3\ Zelda double knit scarf. This one’s a beast, what you see here isn’t even a quarter of the whole thing. I paused it because I had other things to make more urgently. It’ll be my main project after number 4 is done. 4\ my current main project is this jumper with custom yoke design by my son, based on a favourite album of mine. This has to finish by the end of the month as I want to wear it to a live concert next month! So that’s the plan. Finish the jumper, then the scarf, then the sock, while background crocheting the blanket. No frogging!

Replies (1)

  • @Sobtanian@mstdn.games 2026-09-08 20:22

    Friends, a Jarre Equinoxe Jumper update: I’ve finished 23 rounds of the yoke pattern, with 6 left. Once that’s done, it’s all downhill from there as this has been made from the bottom up, so just the neck will be left \o/ For reference, the yoke is based on Jarre’s Equinoxe album. My son designed the yoke pattern for me, and I think he did a cracking job. Idea is to wear this next month for his concert in Amsterdam! #FinishOrFrogAlong #knitting

    Open ##4662292